
Brookville Lake Spillway Bank Protection & Access Road
Rock Solid Solutions on Rocky Terrain
Client
N/A
Location
Brookville Lake, Indiana
Services
Project Overview
Taking on steep terrain challenges, our team executed a comprehensive bank stabilization project featuring strategic riprap placement and precision grouting along the Brookville Lake spillway. The scope required specialized equipment positioning and boom reach capabilities to safely install massive quantities of armor stone across challenging grades while maintaining strict quality control.
Technical Implementation
Innovative construction access development allowed efficient material delivery and placement while preserving surrounding natural areas. The project incorporated engineered granular bedding layers and geotextile installation to ensure proper drainage and prevent material migration under high-flow conditions.
Project Results
Custom concrete pumping solutions facilitated precise grout placement to lock the armor stone matrix into a unified protective system. The completed improvement provides robust infrastructure protection while establishing reliable maintenance access for future operations.
Project Gallery
